-
When you
see this
mouse
click it for
more
information!
This symbol
means it is an
interactive
page.
-
Look up the meaning of math terms not
in your text.
[
Here
]
-
[
CMP -
What Do You Expect?
]
[
Click here for the math in this unit...
]
12-19-2005 Math 2
1. Average nth Grader Data Collection
2. Cumulative Graph information Drill
OBJECTIVE: Students will collect personal data for an 8th grade project, but parts of the data will be used for the statistical portion of grade 7 requirments. [1.4.3][1.4.4][1.4.5][1.4.6] ACTIVITIES/ASSESSMENT: Students will complete the form from Measurements in the Middle Grade page 21 provided by Mr. Stein's math class. NOTES: HOMEWORK: Page 30 #20
12-20-2005 Math 2
1.HOMEWORK: Page 30 #20
2. Cumulative Graph information Drill
3. Measure Drill
4. Pp32ff Problem 3.1
OBJECTIVE: •To review and come to a deeper understanding of experimental and theoretical probabilities and the relationship between them[1.4.1][1.4.2][1.4.3] •To begin thinking about probabilities in terms of area on a grid as an introduction to the area model for analyzing probabilities[5.1.1][5.1.2] ACTIVITIES/ASSESSMENT: Cumulative Graph information Drill; Measure Drill; Pp32ff Problem 3.1 dealing with probability and area. NOTES: HOMEWORK: Pp37&38 #5
12-21-2005 Math 2
1.HOMEWORK: Pp37&38 #5
2. Cumulative Graph information Drill
3. Measure Drill
4. Evaluation of on-line probability module eNLVM
OBJECTIVE: See 12-20 above. ACTIVITIES/ASSESSMENT: Students will review probability concepts by evaluating the online probability prototype module from eNLVM. NOTES: HOMEWORK: None
When you see this
mouse
click it for
more
information!