The Team
graphic

graphic
[Interactive Graphic Graphs from Tables Tool]Link Graphic
Lesson Plans - Math 2A
  • When you see this mouse graphic click it for more information! This symbol Interactive Graphic means it is an interactive page.
  • Look up the meaning of math terms not in your text. [Here ]Link Graphic [and here!]Link Graphic
  • [CMP - Comparing and Scaling]Link Graphic   [Click here for the math in this unit...]Link Graphic
  • [1.3.3] These symbols are links to the State Essential Learnings. Click on them to go to the site which lists these requirments.

Numbered assignments are listed on the day they are DUE!

Enter the values from your proportion problem. Place an x in the box where the unknown goes..
A 
C 

  = 
B 
D 

LeMieux, 2001


[Percent Proportion solver]Link Graphic


Proportion equation set-ups
Percent proportion equation


2-2-2004 Bring your calculator!
1. -Homework: Page 89-90 Quiz...
2. -Page 53Problem 5.1..

OBJECTIVE: •To use geometric scaling to estimate population counts •To apply proportional reasoning to situations in which capture-tag-recapture methods are appropriate for estimating population counts [1.4.6] •To use ratios and scaling up or down (finding equivalent ratios) to find the missing value in a proportion[1.1.4] •To use rates to describe population and traffic density (space per person or car) ACTIVITIES/ASSESSMENT:Warm-Up (proportion, percent proportion, estimation). Page 52ff Problem 5.1 'Estimating the size of a crowd' NOTES: HOMEWORK: P59#3 P61#10

2-3-2004 Bring your calculator!
1. -Homework: Page 59#3; Page 61#10.
2. =Page 54 Problem 4.2......

OBJECTIVE: See 2-2 above. ACTIVITIES/ASSESSMENT: Warm-Up (proportion, percent proportion, estimation). Do page 52, problem 5.2 'Estimating a deer population' Do as a large group project - one set of beans do a public count, individually analyze data. NOTES: HOMEWORK: Pp59-60 1/2/4

2-4-2004 Bring your calculator!
1. -Homework: Pages 59-60 1/2/4.
2. -Page 55 Problem 5.3.......

OBJECTIVE: See 2.2 above. ACTIVITIES/ASSESSMENT: Warm-Up (proportion, percent proportion, estimation). Page 55 problem 5.3 'Finding population densities' Work as singletons or pairs. NOTES: 1/2 extra credit - P61 #6 HOMEWORK: P61 5/7/8

2-5-2004 Bring your calculator!
1. -Homework: Page 61 5/7/8....
2. =Page 58 Problem 5.5+Follow-Up #2..

OBJECTIVE: See 2.2 above. ACTIVITIES/ASSESSMENT: Warm-Up (proportion, percent proportion, estimation) Page 58 problem 5.5 'Predicting Traffic Jams' Do the problem and Follow-Up Question #2 NOTES: HOMEWORK:

2-6-2004 Bring your calculator!
1. -Homework: Page 61#10 Page 62#11.
2. -WarmUp Quiz.....

OBJECTIVE: See 2.2 above. ACTIVITIES/ASSESSMENT: WarmUp Test, Question Bank Handout - Do 1-2-3-4-6-10-11 NOTES: HOMEWORK: Finish Question Bank items



When you see this mouse graphic click it for more information!